Updating of the design and detail design documentation of Building 5 and Building 4 of the pharmaceutical plant located at: Moscow, Zelenograd, Alabushevo site
PROJECT OVERVIEW
The joint pharmaceutical complexR-Opraorganized on the site Alabushevo of the special economic zone (SEZ) Technopolis Moscow will be engaged in industrial production of drugs of the hospital segment for the treatment of cardiac, oncologicaland psychiatric diseases, respiratory diseases, as well as multiple sclerosis and chronic renal failure.
R-PharmGroup's investments in the construction and equipping of the production will amount to more than 6 billion rubles.
Project Period:
2022–2023
MISSIONS OF SETEC INGINIRING
- Process solutions
- Interior lighting system and power equipment
- Internal water supply and wastewater disposal networks
- Heating, heat supply, cold supply, ventilation and air conditioning
- Smoke ventilation
- Steam piping system
- Automatic fire alarm system and public address and evacuation control system
- Communication and alarm networks (structured cabling network, intrusion alarm system, CCTV, access control system, site-specific warning system and radio broadcast system)
- Obtaining approvals of documentation from state assessment authorities
- Designer supervision
- BIM model creation
Client:
OOO R-Opra