Mariinsky Theatre
Client:
Foundation of the investments in construction in Saint-Petersburg (FISP)
Consolidated financing of the Russian Federation and the International Bank for Reconstruction and Development.
General designer
SETEC ING LLC is the responsible party of the consortium FABRE/SPELLER, SCENE
Architect
FABRE/SPELLER
Historical monument consultant
Raphael Dayanov
Stage process
SCENE
Implementation period
Project start: November 2002
Project finish: December 2006
SETEC ING LLC tasks
General construction works, structures and technical networks:
- Investigation and General concept of the reconstruction works
- Preliminary design development
- Development of the Project design documentation package;
Tender documentation
Main characteristics
Renovation and global reconstruction of the historical building
Creation of new space for fabrication and storage of stage scenery
Entire renovation of the stage
equipment
Acoustical improvement
Building safety
Reconstruction of the structures and façades
Renovation and restoration of the technical networks:
- Power supply
- Water supply and water drainage.
- Fire safety
- HVAC;
- Low voltage systems
Construction cost: 50 M€