Maly Theater
Client
State Academic Maly Theater
General Contractor
ZAO«Glavzarubezhstroy»
General Designer
ООО«Zarubezhproekt»
Architect
ООО«Technologuiya teatra»
Technology (scenography, acoustics etc.)
ООО«TDM»
(Theater Decoration workshops)
Years
Start: August 2011
Delivery: December 2015
Tasks of ООО «SETEC ING»
Project of rearrangement of the existing utilities for the period of construction of a foundation slab.
Developing of design documentation
Presentation of the Project to the State Expert
Developing of Working design documentation
Developing of a superpose plan in a 3D model
Main characteristics
Reconstructiontakingintoaccount conservation of the historical look of the architectural monument of the XIX century – the building of the State Academic Maly Theater
Complete upgrading of the scenographic equipments
Acoustics improvement
The building’s security
Reconstruction of the structures and foundations
Replacement of all the utilities and engineering systems
- Power supply
- Water supply and sewage
- Fire safety
- Heating,ventilation
- Cold supply, air conditioning
- Low voltage systems