Grand Palace in Tsaritsino
Client’s representative
ZAO “UKS Moscapstroy”
Project designer
«SETEC ING»
Architect
Mosproekt 2 – Workshop 3
Implementation period
Start: 2005 г.
Delivery: 2007г.
Tasks of ООО «SETEC ING»
Development of engineering systems and museum equipment design disciplines on pre-design, design and detailed design stage. Elaboration of common underground space under the Grand Palace and “Hlebnyi dom”:
- Heating,ventilation
- Cold supply, air conditioning
- Water supply and sewage
- Fire prevention and protection activities
- Power supply
- Illumination of public and technical zones
- Museum illumination
- Security systems
- Low voltage systems: structural cable systems, PABX, public address and intercom, television, installation of radio, telephony, master clock system
- Installation of a third (emergency) power supply source
- Dynamic system of visitors routing
- Audio and visual stage equipment for multifunctional halls
- Multimedia technologies
Author’s supervision
Main characteristics
Restoration and adaptation of a historical and cultural monument of federal significance in Tsaritsino for museum, exhibition and leisure needs.
Total area – 13500 sq.m.
Simultaneous attendance – up to 1500 people