IKEA FIRE SAFETY SYSTEM
Client:
OOOIKEA MOS (Trade and Real Estate)
Designer:
SETEC INGLLC
Design works:
2013
Mission of Setec Inginiring:
Survey of the facility
Updating the as-built documentation
Design
Drawing up the set of tender documentation
Characteristics of the Facilities:
The services were rendered for the following facilities:
MEGA Dybenko S=182 000 m2
MEGA Yekaterinburg S=124 700 m2
MEGA Novosibirsk S=130 500 m2
MEGA Omsk S=161 400 m2
MEGA ParnasS=119 000 m2
Description, Design Solutions and Challenges:
A MEGA family shopping mall (MEGA) is a two-storey building with a mezzanine and a non-heated parking lot on level 1.
Modernisation of the fire safety systems.
SETEC INGeffectuated a very complex audit of the fire safety systems in MEGA’sbuildings without suspending their operation.
The audit was effectuated both in compliance with the Russian regulations and IKEA’snorms.
SETEC INGprepared design and tender documentation for the modernisation and repair of the fire safety systems.
Following that, updated as-built documentation was drawn up.
A special testing procedure was worked out including protocols, requirements to the equipment, tools and devices.