Soft-ripened cheese production facility and its utilities building at the belebeyevsky dairy plant in Bashkortostan
PROJECT OVERVIEW
Construction of a new facility for the production of soft-ripened cheese, as well as its utilities building, within the existing dairy plant in Belebey, after its merging with Savencia Fromage & Dairy.
Production building area: 17 182 m2
Utilities building area: 552 m2
DESIGN STAGES
- General design
- Stage P design documentation
- Detail design documentation
- BIM model
- Analysis of tender offers
- Assistance in construction contracts preparation
- Designer supervision
- Technical supervision
- Construction management
Project Period:
2019–2020
MISSIONS OF SETEC INGINIRING
Zero cycle works (earthworks and pile foundation), construction management and designer supervision
- Management, coordination and control of engineering surveys
- Control and approval of as-built documentation
- Preparation of the Project schedule, tracking of compliance with the work deadlines
- Financial control and reporting on the cost of construction and installation works
- HSE requirements control in accordance with Russian legislation
- Control of test and acceptance procedures
- Consultations with the authorities and obtainment of necessary permits for facility construction and commissioning
Client:
AO Belebeyevsky ordena Znak Potcheta molotchny combinat (Savencia Fromage & Dairy)