Third Traffic Ring
Customer
ООО “ORGANIZATOR”
Consultant
SETEC TPI
Implementation period
1999-2000
Tasks of OOO “SETEC ING”
Technical appraisal on five the most important structures on the Third Ring Road.
Preparation of a report and analysis of the technologies utilized in various projects.
Comparison of similar projects in terms of construction cost.
Main features
A few bridges and cut-and-cover tunnels on the Third Ring Road:
- Two level bridge made of steel trusses (motor road and railway);
- Steel bridge over the Third Traffic Ring;
- Long reinforced-concrete bridge with parking at the lowest level;
- Tunnel with underground interchange.